Construction scheduling consultants: Schedules built to be used — not just submitted.

Landmark Construction Consulting builds, updates and analyzes CPM schedules in Primavera P6 and Microsoft Project for general contractors, owners and developers. You get a plan the field believes, reporting that explains what changed, and early warning when the finish date is at risk.

30 minutes, no obligation. Bring your schedule, your spec or just your questions.

Illustrative example

Five-story mixed-use building

Forecast completion Week 60 On the contract date

Baseline: The critical path runs through structure, framing, dry-in and finishes. Switchgear delivery has seven weeks of float — for now.

Forecast completion Week 63 3 weeks late

Month 8 update: The switchgear ship date has slipped ten weeks. It has used all seven weeks of its float and now drives power-on, commissioning and turnover.

Forecast completion Week 61 2 weeks recovered

Recovery plan: Start-up begins on temporary power three weeks before the gear lands, with feeders pulled and terminations prepared in advance. One week still to find.

Illustrative example with simplified durations — not a client project.

Schedule data for the illustrative example, in project weeks
ActivityBaselineMonth 8 updateRecovery plan
Sitework & foundationsweeks 0–10, criticalweeks 0–10weeks 0–10
Podium structureweeks 10–18, criticalweeks 10–18weeks 10–18
Wood framing, levels 2–5weeks 18–32, criticalweeks 18–32weeks 18–32
Roofing & envelopeweeks 26–40, criticalweeks 26–40weeks 26–40
MEP rough-inweeks 24–42weeks 24–42weeks 24–42
Switchgear procurementweeks 4–38weeks 4–48, criticalweeks 4–48, critical
Interior finishesweeks 34–54, criticalweeks 34–54weeks 34–54
Power-on & commissioningweeks 44–53weeks 48–57, criticalweeks 45–55, critical
Inspections & turnoverweeks 54–60, criticalweeks 57–63, criticalweeks 55–61, critical
Platforms
Primavera P6 & Microsoft Project
Project types
Commercial, mixed-use & multifamily
Based in
Boise · Los Angeles
Serving
Projects nationwide

Why it matters

A schedule should answer questions, not raise them.

Most schedules are built to satisfy a specification and then left behind by the job. Ours are built to be used: by the superintendent on Monday morning and by the owner at the monthly meeting.

A plan the field believes

Built with your superintendent and trades, so the sequence on paper is the sequence they intend to build.

A finish date with reasons

Every update explains what moved, what moved it, and how much float is left on the work behind it.

Early warning, not late surprises

Near-critical work and long-lead deliveries are watched before they reach the critical path.

A record that holds up

Changes and delays are documented as they happen, in the form your contract asks for.

Scaffolded residential wings around a courtyard deck, with reinforcing steel standing ready for the next pour

Thoughtful planning. Purposeful progress.

Construction scheduling services

Support at every stage, from first sequence to final analysis.

Eight services, organized the way a project runs. Take one, or have us carry the schedule from preconstruction through closeout.

Compare all services

Who we help

Different seats at the table. One schedule everyone trusts.

For general contractors

A scheduling department, on call.

Baselines built to pass review, updates that go out on time, and look-aheads your superintendents will use — without adding a full-time scheduler.

  • Specification-compliant baselines and monthly updates
  • Look-aheads tied to the CPM schedule
  • Time impact analyses when the job changes
Scheduling for general contractors

For owners & developers

An independent read on the finish date.

A second set of eyes on your contractor’s schedule, and a credible answer when a lender, board or tenant asks when it will be done.

  • Baseline and monthly update reviews
  • Evaluation of time-extension requests
  • Preconstruction timelines and cash-flow curves
Schedule oversight for owners

From the field

Every bar on the schedule is a place on site.

A schedule is only as good as the scheduler’s grasp of the work. These are our own photographs from time on site, in the order a building goes up.

How we work

Listen closely. Plan deliberately.

A useful schedule starts with a useful conversation. Here is what working with us looks like.

  1. Start with a conversation

    A free 30-minute call about the project, the contract and what you need the schedule to do.

  2. Agree on a clear scope

    You receive a written scope, fee and timeline before any work begins.

  3. Build it with your team

    We work from your documents and from the people running the job, so the schedule reflects how it will be built.

  4. Keep it current and clear

    Regular updates, plain-English reporting, and a direct line to the person who built your schedule.

What you receive

More than dates on a page.

Every deliverable is written so the next conversation is a better one — for the people building the job and the people paying for it.

  • Native schedule files you own (.xer or .mpp)
  • Clear PDF layouts: full schedule, critical path, milestones
  • A plain-English narrative with every update
  • Look-aheads the field can run a meeting from
  • Analysis that shows its work when time is in dispute

Schedule narrative — Update 08

Illustrative example

Data date Week 32 Pay application 08

Forecast completion Week 63 Contract: week 60

Change this period +3 weeks Was on time last month

Critical path Switchgear Was interior finishes

What changed this period

Framing topped out on level 5 and roofing started on the east half. The switchgear manufacturer revised its ship date by ten weeks, to week 48.

What is driving completion

Switchgear delivery now controls permanent power, elevator inspection, commissioning and turnover. Interior finishes, critical last month, now have three weeks of float against the forecast date, and none against the contract date.

Decisions needed

  1. Authorize temporary power for equipment start-up — needed by week 34.
  2. Release the elevator installer to mobilize on temporary power.
  3. Confirm whether phased turnover by floor is acceptable to the owner.

Pricing

Clear prices, published.

Most scheduling consultants make you ask. Ours are on the website, with what each one includes and what moves it up or down.

CPM baseline schedule
$4,000 – $5,000 per schedule
Monthly update package
$1,750 per month
Hourly work
$175 per hour

See every price and what it includes

A red tower crane above stacks of lumber on a plywood floor deck

About Landmark

Grounded in the details. Focused on the whole.

Landmark Construction Consulting is an independent scheduling practice based in Boise, Idaho and Los Angeles, California. We work with general contractors, owners and developers on commercial, mixed-use and multifamily projects across the country.

The practice is principal-led. The person you speak with on the first call is the person who builds and maintains your schedule.

Based in
Boise, ID · Los Angeles, CA
Serving
Projects across the United States
Platforms
Primavera P6 · Microsoft Project

More about Landmark

Good to know

Before we begin.

Short answers to the questions we hear most. For anything else, ask us directly.

What does a construction scheduling consultant do?

A construction scheduling consultant builds and maintains a project’s critical path method (CPM) schedule: the baseline plan, the regular updates that track real progress, and the analysis that explains what is driving the finish date. When the plan changes, the same consultant prepares recovery schedules, time impact analyses and delay analyses.

When should we bring in a scheduler?

The best time is before construction starts, while the baseline is being built and the contract dates can still be tested. The next best time is as soon as the schedule stops matching the job: a rejected submittal, a finish date that keeps moving, or a change whose time impact you need to show. Our guide to when to hire a scheduling consultant lists the signs.

Do you work in Primavera P6 or Microsoft Project?

Both. We work in whichever platform your contract requires and deliver the native file (.xer or .mpp) along with PDF layouts that anyone on the team can read.

Can you work with a schedule someone else built?

Yes. We start with a health check of the file — logic, constraints, calendars and update history — and tell you what we found before we take it forward.

Do you take projects outside Idaho and California?

Yes. We are based in Boise and Los Angeles and support projects across the United States. Scheduling work is done remotely with regular calls, daily reports and photos, and site visits are arranged when they add value.

What do you need from us to get started?

The contract and its scheduling specification, the drawings, your estimate or schedule of values, and some time with the people who will run the job. For an existing project, add the current schedule file and recent progress reports.

How much does construction scheduling cost?

A CPM baseline schedule for a typical commercial or multifamily project is $4,000 to $5,000, monthly updates are $1,750 a month, and hourly work is $175 an hour. You receive the fee in writing before any work begins, and the first 30-minute consultation is free. Our pricing page has the details.

Free 30-minute consultation

Every good plan starts with a conversation.

Tell us where your project stands and what you need to see more clearly.

986-996-0706 landmarkconstructionconsulting@gmail.com
Boise, Idaho · Los Angeles, California · serving projects nationwide
  1. You send a few details. Two minutes, using the form or the phone.
  2. We talk for 30 minutes. Your project, your schedule, and what is worrying you.
  3. You get a clear recommendation. A scope and fee if we can help — and a straight answer if you don’t need us.

Request your free consultation

Tell us a little about the project. We will reply to arrange a 30-minute call.

We use these details only to reply to you. See our privacy policy. Form delivery by Web3Forms.

Call Free consultation