Construction scheduling pricing: What scheduling costs, in plain numbers.

Most scheduling consultants won’t publish a price. We do. Here are our fees for the work contractors and owners ask for most, what each one includes, and what moves the number up or down.

Our fees

Three numbers, up front.

Typical figures for a commercial, mixed-use or multifamily project. You receive your own price in writing before any work begins.

CPM baseline schedule

$4,000 – $5,000 per schedule

A typical commercial, mixed-use or multifamily project

  • Review of the contract and scheduling specification
  • A sequencing session with your project team
  • A complete, logic-linked CPM schedule in Primavera P6 or Microsoft Project
  • Quality checks and a basis-of-schedule narrative
  • The native file and PDF layouts, ready to submit
  • Responses to the owner’s review comments
More about baseline schedules

Monthly update package

$1,750 per month

One project, updated once a month

  • A progress call with your superintendent or project manager
  • The schedule statused to the data date and recalculated
  • Critical path and milestone variance analysis
  • A plain-English narrative of what changed and why
  • The native file and PDF layouts, ready to submit with the pay application
More about updates and reporting

Hourly work

$175 per hour

For analysis and anything outside a fixed scope

  • Delay analysis and other open-ended assignments
  • Extra meetings or site visits beyond a fixed scope
  • A budget agreed in writing before work starts
More about all services

Fees as of November 2026. Large, phased or cost-loaded schedules are quoted individually.

Other services

Typical ranges for everything else.

These vary more from one job to the next, so each is shown as the range most assignments fall in. You get a written quote before any work begins.

ServiceTypical feeWhat it depends on
Bid & preconstruction schedule$1,500 – $2,500The level of detail the RFP asks for, and whether cost loading is needed.
Weekly look-ahead schedule$800 – $1,200 a monthThe number of areas and trades. Runs on its own or alongside a monthly update package.
Owner-side baseline review$1,800 – $3,000The size of the schedule and the detail in the scheduling specification.
Owner-side monthly update review$750 – $1,200The size of the schedule and how much changed since the last update.
Recovery schedule$2,500 – $4,000The condition of the current schedule and the number of options to model.
Time impact analysis$2,500 – $4,000 per eventThe number of events and how well each one is documented.
Delay analysisFrom $10,000Billed at $175 an hour against an agreed budget. Depends on the length of the project, the records available and the questions to answer.

Market context

Where these numbers sit in the market.

Very few scheduling firms publish prices, so we looked at what is public. As of November 2026, a current federal GSA schedule lists a senior scheduler at $164 to $204 an hour, and on-call construction management contracts at John Wayne Airport in Orange County, California list senior schedulers at $160 to $295 an hour, most of them above $225. Our hourly rate is $175.

Our baseline and update fees are fixed. You are buying the finished schedule, not a block of hours, so you know the cost before we start.

You will also see CPM schedules advertised online for a few hundred dollars. Those prices are usually for a single trade or a small scope with a fast turnaround. That can be exactly right for a subcontractor. For a contract baseline that an owner will review, check the list beside this before comparing prices.

The other alternative is a full-time scheduler. Average pay for a construction scheduler is about $98,000 a year in Los Angeles and $87,000 in Boise (ZipRecruiter, November 2026), before benefits, software and training. A baseline and twelve monthly updates from us come to about $25,000 to $26,000.

What changes the price

Six things that move the number.

Size and complexity

More buildings, phases and trades mean more activities and more logic to build and check.

What the specification asks for

Cost or resource loading, extra reports, a required software version or a public agency’s format all add work.

The state of the existing schedule

Taking over a schedule that needs repair costs more in the first month than maintaining one we built.

How often it is updated

Monthly is standard. Updates every two weeks or a weekly look-ahead change the monthly figure.

How fast you need it

A baseline due in days instead of weeks may need the schedule built in a compressed window.

Meetings and site visits

Remote support is included. Regular attendance at owner meetings or travel to the site is quoted separately.

How quoting works

A price you can put in your general conditions.

  1. A free 30-minute call

    You describe the project and what you need. There is no charge and no obligation.

  2. A price in writing

    You receive a written scope and fee for the work, so the cost is known before anything starts.

  3. No surprises afterward

    If the scope changes — a second building, cost loading added late — we agree on the change before doing it.

Pricing questions

Questions, answered.

How much does a CPM baseline schedule cost?

For a typical commercial, mixed-use or multifamily project, our baseline schedules run $4,000 to $5,000. That covers the specification review, a sequencing session with your team, the complete CPM schedule, the narrative and responses to the owner’s review comments.

How much do monthly schedule updates cost?

$1,750 a month for one project updated monthly. Each update includes the progress call, the statused schedule, critical path and variance analysis, and a written narrative ready to submit with the pay application.

What is your hourly rate?

$175 an hour. It applies to delay analysis and other open-ended work, and to anything outside a fixed scope, always against a budget agreed before the work starts.

What does scheduling cost over a whole project?

As a worked example, a baseline plus twelve monthly updates comes to about $25,000 to $26,000. On a $10 million, twelve-month project that is roughly a quarter of one percent of the construction cost.

Why are some CPM schedules advertised for a few hundred dollars?

Usually because the scope is much smaller: one trade, a short duration, or a bar chart without a specification review, a working session or a narrative. Compare what is included before comparing the price.

Is outsourcing cheaper than hiring a scheduler?

For a contractor without enough work to keep a scheduler busy full time, usually yes. A full-time construction scheduler averages about $87,000 a year in Boise and $98,000 in Los Angeles before benefits, software and training (ZipRecruiter, November 2026). Outsourcing costs only what each project needs, and stops when the project does. Our guide on when to hire a scheduling consultant sets the two side by side.

Is the first consultation really free?

Yes. The first 30-minute call costs nothing and carries no obligation. You leave it with a clear idea of what you need and what it would cost.

Do you charge a fixed fee or by the hour?

A fixed fee wherever the scope can be defined, which covers baselines, monthly updates and most single assignments. Open-ended analysis, such as delay work, is billed at $175 an hour against a budget agreed before it starts.

Free 30-minute consultation

Bring your schedule, your spec or just your questions.

Thirty minutes with a scheduler, no obligation. We will look at where your project stands and tell you plainly what would help.

Call Free consultation