The short answer

What is an independent schedule review?

An independent schedule review is a technical and practical check of a contractor’s schedule on the owner’s behalf. At baseline, it tests whether the plan is complete, logical and achievable. At each update, it tests whether reported progress and the forecast completion date hold up.

Owners accept schedules that shape their position for the rest of the project — float, time extensions, liquidated damages. A review puts someone who reads schedule logic for a living on your side of the table, and turns a file with thousands of activities into a short list of what matters.

What’s included

What the work covers.

Baseline review

Scope coverage, logic, durations, constraints, calendars and critical path checked against the contract and the scheduling specification.

Owner activities checked

Review periods, owner-furnished items, permits and utility work are checked for realistic durations and fair logic.

Monthly update review

Reported progress is compared with the pay application, changes since the last update are identified, and critical path shifts are explained.

Change detection

Edits to logic, durations or calendars between updates are found and flagged, so the forecast can’t move quietly.

Written comments

Clear, numbered review comments you can send to the contractor, sorted by severity, with the response each one needs.

Decision summary

A one-page read for executives and lenders: forecast completion, confidence, top risks and recommended actions.

Sample deliverable

Comments you can send as written.

Baseline review comments — Submission 01

Illustrative example

AreaCommentPriorityResponse needed
Logic34 activities have no successor, so float is overstated on those paths.HighAdd logic or justify
ConstraintsA mandatory finish constraint on “Level 2 turnover” holds the milestone on its date even though its predecessors finish later, so the slip never reaches completion.HighRemove, or tie to a contract milestone
Owner activitiesSubmittal reviews are shown at 5 working days. The contract allows 10.MediumRevise durations
ProcurementElevator fabrication and delivery do not appear in the schedule.HighAdd the procurement chain
CalendarsExterior concrete and roofing use a five-day calendar with no weather allowance. The contract requires anticipated weather days.MediumRevise calendars

How it works

From first call to delivery.

  1. Receive the submittal

    We need the native schedule file, the narrative and the specification. PDFs alone hide the logic.

  2. Analyze

    We run technical checks, compare against the prior version, and review the plan for completeness and constructability.

  3. Report

    You receive written comments and a short summary, with a recommendation on acceptance.

  4. Follow through

    We review the contractor’s responses and resubmittals, and join schedule discussions when useful.

Deliverables

What you receive

  • Numbered review comment log, ready to transmit
  • Executive summary with forecast completion and key risks
  • Comparison of changes since the previous submission
  • Recommendation: accept, accept as noted, or revise and resubmit
  • Evaluation of time-extension requests, when submitted

To get started

What we need from you

  • The contractor’s native schedule file (.xer or .mpp) for each submission
  • The schedule narrative and any time impact analyses
  • Contract, general conditions and scheduling specification
  • Pay applications and recent progress reports

Common questions

Questions, answered.

How much does an independent schedule review cost?

A baseline review is typically $1,800 to $3,000, and a monthly update review $750 to $1,200, depending on the size of the schedule. See our pricing page.

Does reviewing the schedule make the owner responsible for it?

Not normally. The contractor owns the schedule and the means and methods, and most contracts say the owner’s review or acceptance does not change that. A well-run review comments on compliance and reasonableness without directing the work, and we write comments with that line in mind. Check the wording in your own contract.

What should we require from the contractor?

The native schedule file with every submission, not just a PDF, plus a narrative describing progress and changes. Without the native file, logic and float can’t be checked.

How quickly can you review a submission?

The specification usually sets the owner’s review period, and we work inside it. Tell us the deadline when you send the file.

Can you evaluate a contractor’s time-extension request?

Yes. We check the time impact analysis against the contract’s requirements, the schedule it was inserted into and the project record, and give you a reasoned position on the days requested.