CPM baseline schedules: Baseline schedules built to be accepted — and used.

A complete, logic-driven CPM baseline in Primavera P6 or Microsoft Project, built with your project team and checked against the contract’s scheduling specification before it is submitted.

Typical fee $4,000 – $5,000 per schedule See pricing

Reinforcing steel laid out across a formed concrete deck before the pour

The short answer

What is a baseline schedule?

A baseline schedule is the project’s plan of record: a critical path method (CPM) model of how the work will be built from notice to proceed through substantial completion. Every activity has a duration and is tied by logic to what comes before and after it, so the software can calculate which sequence of work controls the finish date — the critical path.

Everything that follows is measured against it. Monthly updates, time-extension requests and any later delay analysis all start from the baseline, which is why owners review it closely and why it is worth getting right before work gathers pace.

What’s included

What the work covers.

Specification review

We read the scheduling specification, milestones, liquidated-damages clauses and phasing requirements first, so the schedule is built to the contract instead of corrected to it.

Sequencing with your team

A working session with your project manager, superintendent and key subcontractors sets the construction approach. The schedule reflects how they intend to build.

Complete logic, realistic durations

Every activity has a predecessor and a successor, constraints are used sparingly, and durations come from quantities and crew flow — not from the end date.

Procurement tied to installation

Submittals, approvals, fabrication and delivery for long-lead items are linked to the work they feed, so a late release shows up as a late finish.

Calendars, weather and coding

Work calendars, holidays and anticipated weather days per the contract, plus activity codes for area, phase, trade and responsibility.

Cost and resource loading

Where the contract asks for it, activities carry cost and labor so the schedule produces cash-flow curves and supports pay applications.

Quality control

What “checked before it is submitted” means.

Checks we run before a baseline goes out

Illustrative example

CheckWhat we look forWhy it matters
Open endsEvery activity except the first and last has a predecessor and a successorMissing logic hides the true critical path
ConstraintsDate constraints limited to contract milestonesHard constraints override logic and distort float
Lags and leadsLags short and explained; no negative lagsHidden time belongs in an activity people can see
DurationsLong activities broken down, apart from procurementDetail makes progress measurable
FloatHigh-float activities reviewed for missing tiesExcess float usually means missing logic
Critical pathOne continuous path that makes construction senseIt is the first thing a reviewer reads
CalendarsWork weeks, holidays and weather allowance per the contractCalendars change every calculated date
ProcurementLong-lead items tied to the work they feedLate buyout is a common cause of late finishes
Contract datesMilestones, phasing and access limits match the contractThe baseline becomes the yardstick for time

How it works

From first call to delivery.

  1. Kick off and gather

    We collect the contract, drawings, estimate and any bid schedule, and agree on the submittal date.

  2. Sequence the work

    A working session with the people who will run the job sets phasing, crew flow and key durations.

  3. Build and check

    We build the network, calculate the critical path and run quality checks for open ends, constraints, lags and float.

  4. Review with the team

    Your team reviews a draft in plain layouts. We revise until it is a plan they will stand behind.

  5. Submit and respond

    We prepare the submittal package and respond to reviewer comments through acceptance.

Deliverables

What you receive

  • Native schedule file (Primavera P6 .xer or Microsoft Project .mpp)
  • Full Gantt layout organized by work breakdown structure, as PDF
  • Critical path (longest path) and milestone summary layouts
  • Basis-of-schedule narrative: assumptions, calendars, constraints and critical path
  • Cost- or resource-loading reports and cash-flow curve, when required
  • Written responses to reviewer comments

To get started

What we need from you

  • Contract, general conditions and the scheduling specification
  • Drawings, phasing and logistics plans
  • Estimate or schedule of values
  • Subcontractor durations and lead times for long-lead items
  • Time with your project manager and superintendent for a working session

Common questions

Questions, answered.

How much does a baseline schedule cost?

For a typical commercial, mixed-use or multifamily project, $4,000 to $5,000, fixed in writing before we start. Large, phased or cost-loaded schedules are quoted individually. See our pricing page for what is included.

How long does it take to build a baseline schedule?

It depends on the size of the project and how quickly the team can give input. Most of the calendar time goes to the team’s review, not the modeling. We agree on the submittal date at kickoff and plan backward from it.

Primavera P6 or Microsoft Project?

Whichever the contract requires. If it is silent, we recommend one based on the size of the job, who needs to open the file, and whether cost loading or multiple calendars are involved. We work in both.

The owner rejected our baseline. Can you fix it?

Usually, yes. We start with the reviewer’s comments and a health check of the file, correct the logic, constraints or missing scope behind the rejection, and resubmit with a response to each comment.

Who owns the schedule?

You do. You receive the native file with every submittal, and the plan is your team’s plan. We build and maintain the model.

Free 30-minute consultation

Bring your schedule, your spec or just your questions.

Thirty minutes with a scheduler, no obligation. We will look at where your project stands and tell you plainly what would help.

Call Free consultation