Commercial construction scheduling: Fixed opening dates. Schedules that respect them.

Office, retail, hospitality, mixed-use and tenant improvement work — where turnover dates are tied to leases and openings, and the schedule has to coordinate more parties than the site has room for.

A finished commercial space with white walls and exposed timber ceiling and ductwork

What makes commercial work different

Many parties, one date, no room to slip.

Commercial projects finish against dates someone else is counting on: a tenant’s lease commencement, a store opening, a hotel’s first booking. The work in front of those dates involves the owner’s vendors, the tenant’s contractors, the building’s systems, and inspections that can’t be rushed.

A commercial schedule earns its keep by showing those hand-offs clearly: when the shell is ready for tenant work, when owner-furnished equipment has to arrive, and how much time testing, inspections and move-in really need before the doors open.

How we schedule commercial work

Built around the dates other people are counting on.

Turnover dates as milestones

Lease, opening and occupancy dates are built in as contract milestones, with the path to each one visible.

Occupied-building phasing

After-hours work, shutdowns, noise limits and temporary partitions are scheduled with the restrictions they carry.

Owner and tenant work

Owner-furnished equipment, furniture, low-voltage and tenant contractors appear in the schedule with the access they need.

A planned closeout

Commissioning, life-safety testing, final inspections and punch are sequenced with real durations.

Long-lead equipment

Switchgear, rooftop units, elevators and specialty items are tracked from submittal to start-up.

Mixed-use complexity

Retail, parking and residential components are scheduled as linked subprojects, each with its own turnover.

Common questions

Questions, answered.

Do you schedule tenant improvement projects?

Yes. Tenant improvements are short and unforgiving: long-lead items and inspections often take longer than the construction. We schedule them from lease signing to move-in.

Can you coordinate a core-and-shell schedule with tenant work?

Yes. We tie shell milestones to tenant start dates so each party can see what they are waiting on, and what is waiting on them.

How do you handle work in an occupied building?

By scheduling the restrictions explicitly. Working hours, shutdown windows, phasing and temporary measures all appear as calendars, constraints or activities.

Is Microsoft Project acceptable for commercial work?

Often, yes. Many private commercial contracts accept either platform. We recommend one based on the contract, the size of the job, and who needs to open the file.