Bid & preconstruction schedules: Know the duration is real before you sign it.

Proposal and preconstruction schedules that test the owner’s milestones against how the job will really be built — and set up cost loading, cash flow and long-lead procurement before the contract dates are locked in.

Typical fee $1,500 – $2,500 See pricing

An excavated site with shoring along one side, stockpiles of soil and traffic cones in the foreground

The short answer

What is a preconstruction schedule?

A preconstruction schedule — often called a bid or proposal schedule — is the first credible model of how long a project will take and why. It is built from the drawings, the estimate and the team’s construction knowledge before the contract is signed.

It does three jobs. It supports the proposal with a plan the selection panel can follow. It tests the required milestones against realistic sequences and lead times, so you price general conditions and liquidated-damages risk with your eyes open. And it gives the baseline schedule a head start once the job is awarded.

What’s included

What the work covers.

Proposal and interview schedules

Summary to mid-level CPM schedules sized to the pursuit — clear enough to present, detailed enough to defend.

Duration validation

Durations built up from quantities, crew flow and your team’s production rates, then checked against the required milestones.

Phasing and logistics

Sequences for phased turnover, occupied buildings, tight sites, crane and hoist time, and work that weather can stop.

Long-lead procurement

Submittal, approval, fabrication and delivery chains for switchgear, elevators, structure and glazing — with the release dates that protect the finish.

Cost and resource loading

Estimate or schedule-of-values costs loaded onto activities to produce cash-flow curves and manpower histograms.

What-if options

Alternative start dates, phasing plans or turnover strategies modeled side by side so the trade-offs are visible.

Sample deliverable

The schedule, expressed in dollars.

Cumulative cash flow on early and late dates

Illustrative example

Cumulative cash-flow curve Percent of contract value billed by month over a 14-month schedule. On early dates half the value is billed by about month 6.5; on late dates by about month 7.7. 0%25%50%75%100% StartM2M4M6M8M10M12M14 Early dates Late dates
  • Billing if every activity starts as early as it can
  • Billing if every activity starts as late as it can

The space between the curves is the schedule’s float, expressed in dollars. A draw schedule that sits outside it deserves a question.

How it works

From first call to delivery.

  1. Scope the pursuit

    We review the RFP, drawings, milestones and your due date, and agree on how much schedule the proposal actually needs.

  2. Build the sequence with your team

    A working session with your estimator, project manager or superintendent sets the construction approach and key durations.

  3. Model and test

    We build the logic, calculate the critical path and check it against the required dates, lead times and seasonal constraints.

  4. Package for the proposal

    You receive presentation-ready layouts and a short narrative of assumptions, plus the native file for the baseline later.

Deliverables

What you receive

  • Native schedule file (Primavera P6 .xer or Microsoft Project .mpp)
  • Summary and detailed Gantt layouts as PDF, formatted for the proposal
  • Critical path and milestone summary
  • Assumptions and basis-of-schedule narrative
  • Cash-flow (S-curve) and manpower charts when the schedule is cost- or resource-loaded

To get started

What we need from you

  • RFP or contract documents, including any scheduling requirements
  • Drawings, phasing plans and site logistics constraints
  • Estimate summary or schedule of values, for cost loading
  • Known lead times and subcontractor input, where available
  • Your proposal due date

Common questions

Questions, answered.

How much does a bid or preconstruction schedule cost?

Most fall between $1,500 and $2,500, depending on the level of detail the RFP asks for and whether cost loading is needed. You receive a fixed quote before we start. See our pricing page.

How detailed should a bid schedule be?

Detailed enough to prove the duration, and no more. For most proposals that means every major phase, the long-lead procurement chains and the logic that produces the critical path — usually a few hundred activities at most. Trade-level detail is added when the schedule becomes the baseline.

Can you work to our proposal deadline?

Tell us the due date first. We scope the schedule to the time available, and say so plainly if the deadline only allows a summary-level plan.

What is cost loading, and do we need it?

Cost loading assigns the contract value to schedule activities so the schedule can forecast monthly billings and cash flow. Lenders, developers and many public owners ask for it. If nobody is asking, a simpler curve built from the schedule of values may be all you need.

Does the bid schedule become the baseline?

It becomes the starting point. After award we add subcontractor input, submittal and procurement detail, calendars and the coding the specification requires, then submit it as the baseline.