Insights: Plain-English guides to construction scheduling.

Practical explanations of how schedules are built, updated and analyzed — written for the people who rely on them, whether or not they ever open the software.

All guides

Change & delay

Time impact analysis, explained

What a time impact analysis is, when a contract requires one, how to build the fragnet step by step, a worked example, and the mistakes that get TIAs rejected.

7 min read

Reporting

The schedule narrative: example and outline

What a construction schedule narrative is, what owners expect at baseline and at each monthly update, a full written example, and a reusable outline.

6 min read

Planning

Baseline schedule review checklist

A practical checklist for building or reviewing a construction baseline schedule: scope, logic, constraints, durations, float, calendars and critical path.

5 min read

For owners

How to read a schedule update

A guide for owners and project managers: eight questions that show whether a monthly schedule update is telling the truth about progress and the finish.

5 min read

Field planning

How to build a 3-week look-ahead

How to build a three-week look-ahead schedule from your CPM schedule and run the weekly meeting from it. Includes a free Excel look-ahead template.

6 min read

Change & delay

Delay analysis methods compared

The main construction delay analysis methods compared: how each works, the schedules and records it needs, where it is weak, and how to choose between them.

9 min read

Change & delay

Weather days in a construction schedule

How to plan for normal weather in a baseline schedule, record weather days during the job, and show when unusually severe weather supports a time extension.

8 min read

Change & delay

Recovery schedule vs. acceleration

Recovery and acceleration both mean finishing sooner than the current forecast. The difference is who caused the delay — and that usually decides who pays.

5 min read

For contractors

When to hire a scheduling consultant

Seven signs it is time to hire a construction scheduling consultant, how outsourcing compares with an in-house scheduler, and ten questions to ask first.

5 min read

Change & delay

Who owns the float?

Float ownership explained: what float is, the three ways contracts assign it, why it decides time extensions, and a worked example of first-come, first-served.

5 min read

Planning

Cost-loaded schedules, explained

What a cost-loaded construction schedule is, who requires one, how to build it from the schedule of values, how it drives pay applications, and common mistakes.

5 min read

Software

Retained logic vs. progress override

What retained logic and progress override do to out-of-sequence work in Primavera P6, a worked example, which one specifications require, and the better fix.

5 min read

Fundamentals

What is a CPM schedule?

A plain-English guide to CPM scheduling in construction: activities, logic, the forward and backward pass, float and the critical path, with an example.

6 min read

Software

Primavera P6 vs. Microsoft Project

How Primavera P6 and Microsoft Project differ for construction CPM schedules — calculation, baselines, coding, file exchange — and how to choose.

5 min read

Free download

Three-week look-ahead template

The look-ahead format from our look-ahead guide, as an Excel workbook: type a start date and working days, and the bar draws itself.

Download the template

Excel workbook (.xlsx) · 16 KB · No sign-up · What is inside

Reference

54 scheduling terms, defined without jargon.

Float, fragnet, data date, longest path. A searchable glossary of the words that turn up in schedule narratives, specifications and delay claims.

Open the glossary

Rather ask a person?

If a guide raises a question about your own project, a 30-minute call is usually the fastest way to an answer.

Book a free consultation

Free 30-minute consultation

Bring your schedule, your spec or just your questions.

Thirty minutes with a scheduler, no obligation. We will look at where your project stands and tell you plainly what would help.

Call Free consultation