Insights: Plain-English guides to construction scheduling.
Practical explanations of how schedules are built, updated and analyzed — written for the people who rely on them, whether or not they ever open the software.
All guides
Change & delay
Time impact analysis, explained
What a time impact analysis is, when a contract requires one, how to build the fragnet step by step, a worked example, and the mistakes that get TIAs rejected.
Reporting
The schedule narrative: example and outline
What a construction schedule narrative is, what owners expect at baseline and at each monthly update, a full written example, and a reusable outline.
Planning
Baseline schedule review checklist
A practical checklist for building or reviewing a construction baseline schedule: scope, logic, constraints, durations, float, calendars and critical path.
For owners
How to read a schedule update
A guide for owners and project managers: eight questions that show whether a monthly schedule update is telling the truth about progress and the finish.
Field planning
How to build a 3-week look-ahead
How to build a three-week look-ahead schedule from your CPM schedule and run the weekly meeting from it. Includes a free Excel look-ahead template.
Change & delay
Delay analysis methods compared
The main construction delay analysis methods compared: how each works, the schedules and records it needs, where it is weak, and how to choose between them.
Change & delay
Weather days in a construction schedule
How to plan for normal weather in a baseline schedule, record weather days during the job, and show when unusually severe weather supports a time extension.
Change & delay
Recovery schedule vs. acceleration
Recovery and acceleration both mean finishing sooner than the current forecast. The difference is who caused the delay — and that usually decides who pays.
For contractors
When to hire a scheduling consultant
Seven signs it is time to hire a construction scheduling consultant, how outsourcing compares with an in-house scheduler, and ten questions to ask first.
Change & delay
Who owns the float?
Float ownership explained: what float is, the three ways contracts assign it, why it decides time extensions, and a worked example of first-come, first-served.
Planning
Cost-loaded schedules, explained
What a cost-loaded construction schedule is, who requires one, how to build it from the schedule of values, how it drives pay applications, and common mistakes.
Software
Retained logic vs. progress override
What retained logic and progress override do to out-of-sequence work in Primavera P6, a worked example, which one specifications require, and the better fix.
Fundamentals
What is a CPM schedule?
A plain-English guide to CPM scheduling in construction: activities, logic, the forward and backward pass, float and the critical path, with an example.
Software
Primavera P6 vs. Microsoft Project
How Primavera P6 and Microsoft Project differ for construction CPM schedules — calculation, baselines, coding, file exchange — and how to choose.
Free download
Three-week look-ahead template
The look-ahead format from our look-ahead guide, as an Excel workbook: type a start date and working days, and the bar draws itself.
Reference
54 scheduling terms, defined without jargon.
Float, fragnet, data date, longest path. A searchable glossary of the words that turn up in schedule narratives, specifications and delay claims.
Rather ask a person?
If a guide raises a question about your own project, a 30-minute call is usually the fastest way to an answer.